GRIMSBY INSTItute OF TECHNOLOGY REFURBISHMENT

Completed:  Summer 2020

Client: Robertson Construction

Value: £350k


Mechanical & Electrical Refurbishment to various classrooms throughout the college

Small Power

Small Power

Small Power

Existing Distribution Boards were removed and replaced with new Schneider Acti 9 boards complete with MCBs and RCBOs

All classrooms were completely rewired, tested and put into use.

Lighting

Small Power

Small Power

Existing Lighting was removed from classrooms and replaced with a fully designed and commissioned lighting package by Whitecroft Lighting, complete with all emergency lighting throughout

Fire Alarm

Small Power

Fire Alarm

Existing Fire alarm cabling, detectors, call points were removed from the classroom space, rewired and new equipment was installed throughout, then commissioned by colleges specialist sub-contractor

Data

Ventilation

Fire Alarm

Existing Data points were removed and replaced with a new Excel cabling system to a new data cabinet, all installed and tested by our own data installing electricians.

Security

Ventilation

Ventilation

Alterations to existing site wide systems were undertaken as part of the client's requirements, these included Intruder Alarm, Door Access and CCTV, all by the colleges specialist supplier, but managed by J2

Ventilation

Ventilation

Ventilation

Daikin VAM ventilation units were installed in each refurbished classroom to extract the air and supply the air conditioning units with fresh air. 

Air Conditioning

Plumbing & Heating

Plumbing & Heating

Daikin VRF Air conditioning systems were installed in each classroom linked to individual room controls and a master controller linked via BACnet to the in house BMS. New condensers were safely lifted and installed on the roof

Plumbing & Heating

Plumbing & Heating

Plumbing & Heating

Existing heating radiators were removed, and new ones installed to the new locations where HVAC was not installed. Hot and cold-water services and above ground drainage were installed to suit the new refurbished locations and classrooms

    Clients CASE STUDY

    Click below to look at Robertson Constructions case study on the works done at Grimsby IoT 

    Case Study

    Copyright © 2023 J2 Electrical ltd - All Rights Reserved. Company registered in England and Wales with company number 11382872 

    • Privacy Policy

    Cookie Policy

    This website uses cookies. By continuing to use this site, you accept our use of cookies. Privacy Policy

    Accept & Close