Completed: January 2023
Value: £210k
Mechanical & Electrical Design, Installation and commissioning of a new build clubhouse and refurbishment of existing building
Power distribution from new single DNO supply / meter to both buildings, upgrading existing single phase to three phase supply
Small power within both buildings
New JCC lighting designed and installed in all internal and external areas of both buildings. complete with all emergency lighting throughout
New conventional fire alarm installed in both buildings of the project and commissioned, all installed and commissioned by the J2 team
Cat6 Data points installed around both buildings back to centralised cabinet
New intruder alarm system installed in both buidings along with IP CCTV system and monitors inside the building
Plant room fit out of each building has been designed, installed and commissioned by specialist mechanical team for the hot and cold water services and central heating systems. BMS System controls the gas boilers and hot water storage/pumping for each building.